QII Field Checklist

Quality Insulation Installation · RA3.5 · CF3R-ENV-21/22 via CHEERS · HERS/ECC Rater
HERS-PRO LLC · Ben Long
Office: 855-HERS-PRO · Cell: 401-714-8043
[email protected]
⚠ AUTOMATIC FAIL: Covering insulation with drywall or any other material before the HERS/ECC Rater completes their verification is an automatic FAIL. The only remedies are (1) expose the insulation by removing drywall, or (2) perform a whole-building blower door test demonstrating ≤0.40 cfm/ft² building envelope leakage at 0.3 in. w.g.
Project Info
Code cycle:
Overall Progress
0 / 0 resolved (0%)
✓ 0 compliant ✗ 0 non-compliant N/A 0
📷 Field Reference Photos (from CHEERS QII Handbook)
Per RA3.5 · Forms registered through CHEERS · HERS/ECC Rater field verification